Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse

The New Coffee Room

  1. TNCR
  2. General Discussion
  3. I'm too nice, my wife is not

I'm too nice, my wife is not

Scheduled Pinned Locked Moved General Discussion
19 Posts 6 Posters 114 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • 89th8 Offline
    89th8 Offline
    89th
    wrote last edited by
    #7

    The guy is fixing it now, he's doing it more carefully. I think his colleague rushed it a bit.

    1 Reply Last reply
    • MikM Offline
      MikM Offline
      Mik
      wrote last edited by
      #8

      I'd also make them fix the counter. I didn't know it was multiple drops. That's just carelessness that they didn't have it covered.

      "You cannot subsidize irresponsibility and expect people to become more responsible." — Thomas Sowell

      1 Reply Last reply
      • jodiJ Offline
        jodiJ Offline
        jodi
        wrote last edited by
        #9

        We need pictures.

        1 Reply Last reply
        • 89th8 Offline
          89th8 Offline
          89th
          wrote last edited by
          #10

          This is the picture we were shown when we selected the tile. Of course this is with grout so it's hard to know what ours will look like when it's done.

          image.png

          Here are the dings from the dropped tiles.

          999331a3-ae4f-41ca-b025-3382eeb884f3-image.png

          eb47e6b3-fb5b-4299-b711-2ef1a4d522f2-image.png

          440accc8-ea7c-415e-9479-c97cdd7db5bd-image.png

          1 Reply Last reply
          • 89th8 Offline
            89th8 Offline
            89th
            wrote last edited by
            #11

            This was after the first round, I told them we didn't like the small 1" tiles, and the gaps were not good.

            image.png

            image.png

            1 Reply Last reply
            • 89th8 Offline
              89th8 Offline
              89th
              wrote last edited by
              #12

              This was after yesterday, it is better. No short skinny pieces because they planned it better this time. I'm still not convinced the gaps will look perfect after grout, especially down the left and right "vertical seams", but I could be wrong.
              image.png

              1 Reply Last reply
              • 89th8 Offline
                89th8 Offline
                89th
                wrote last edited by
                #13

                For reference, this is what my FIL had done* and is what I am expecting... slightly different tile, but same size tile.

                image.png

                *the guy who did theirs is notoriously slow/OCD, like 3 days staying until 9pm each day, cutting each tile. That's who we requested but he was not available based on scheduling.

                1 Reply Last reply
                • 89th8 Offline
                  89th8 Offline
                  89th
                  wrote last edited by
                  #14

                  And a picture of last night's moon while driving yesterday evening, because, why not.

                  image.png

                  1 Reply Last reply
                  • MikM Offline
                    MikM Offline
                    Mik
                    wrote last edited by Mik
                    #15

                    The first guy didn't know what he was doing and was probably trying to save tile by using scraps. Where those 1" pieces were could have been a single piece. Setting tile is all about planning. Start right, end right.

                    The dings in the counter are unacceptable. It's a brand new counter ferchissakes. It should have been covered by a tarp. Let your wife handle it and do not give them another red cent until it's done. It's not difficult but you have to know how. The counter people should do it and the cost deducted from the tile job payment.

                    "You cannot subsidize irresponsibility and expect people to become more responsible." — Thomas Sowell

                    1 Reply Last reply
                    • 89th8 Offline
                      89th8 Offline
                      89th
                      wrote last edited by 89th
                      #16

                      Yes they had a tarp but a thin one it seems, and if you dropped the previous 3x3 tiles just right, I can see how the dings happen. They are Cambria countertops so they will fix it (and the cost out of the installation job).

                      Your tile comments are spot on. It's about planning, and the 2nd time around I talked through the strategy with the guy. I'll be sure to post after pics later today when the grout is done.

                      1 Reply Last reply
                      • 89th8 Offline
                        89th8 Offline
                        89th
                        wrote last edited by
                        #17

                        Job is finished. Grout definitely helped, I don't see any issues. On the very far left the wall looks rough near the tile as the existing backsplash was out too far, so I have to patch/paint that in a few days.

                        image.png

                        image.png

                        image.png

                        image.png

                        1 Reply Last reply
                        • 89th8 Offline
                          89th8 Offline
                          89th
                          wrote last edited by 89th
                          #18

                          This was the "before" btw. We did the rest of the counter (island, sink, two other areas). The sink is probably my favorite part. Went from a split sink to a 30" wide sink, which is something I didn't expect to enjoy so much lol.

                          image.png

                          vs after.

                          image.png

                          1 Reply Last reply
                          • AxtremusA Offline
                            AxtremusA Offline
                            Axtremus
                            wrote last edited by
                            #19

                            Last time I commissioned a remodeling that involved tiles, I made it a point to choose bigger tiles to minimize grout. Except the ceiling and the bath stall floor. Ceiling because of a tile were to fall I would rather a small piece falls rather than a big piece. Floor because it's supposed to be slightly curved to facilitate water draining, smaller tiles can accommodate curvatures better.

                            1 Reply Last reply
                            Reply
                            • Reply as topic
                            Log in to reply
                            • Oldest to Newest
                            • Newest to Oldest
                            • Most Votes


                            • Login

                            • Don't have an account? Register

                            • Login or register to search.
                            • First post
                              Last post
                            0
                            • Categories
                            • Recent
                            • Tags
                            • Popular
                            • Users
                            • Groups