Garden path
-
Remember the formal garden?
I finally got around to having a mason put in a garden path in the middle of it.
The near end of this section was 8 inches too high.
So, I picked it up. The cobblestone is back on the pallet.
Next I'll pick up the base and make one end 8 inches lower. The base includes a layer of foam (pictured), sand layer, gravel layer and a stone restraint around the edge.
I found out last night that polymeric sand contains a binding agent that forms a solid joint. I thought it was just fine sand.
That made removal a chore.
Why not have the mason come back and fix it? I like a challenge. Temperature in the 40s with some wind.
This could take weeks. A nice hobby for winter.
 -
Remember the formal garden?
I finally got around to having a mason put in a garden path in the middle of it.
The near end of this section was 8 inches too high.
So, I picked it up. The cobblestone is back on the pallet.
Next I'll pick up the base and make one end 8 inches lower. The base includes a layer of foam (pictured), sand layer, gravel layer and a stone restraint around the edge.
I found out last night that polymeric sand contains a binding agent that forms a solid joint. I thought it was just fine sand.
That made removal a chore.
Why not have the mason come back and fix it? I like a challenge. Temperature in the 40s with some wind.
This could take weeks. A nice hobby for winter.
 -
Remember the formal garden?
I finally got around to having a mason put in a garden path in the middle of it.
The near end of this section was 8 inches too high.
So, I picked it up. The cobblestone is back on the pallet.
Next I'll pick up the base and make one end 8 inches lower. The base includes a layer of foam (pictured), sand layer, gravel layer and a stone restraint around the edge.
I found out last night that polymeric sand contains a binding agent that forms a solid joint. I thought it was just fine sand.
That made removal a chore.
Why not have the mason come back and fix it? I like a challenge. Temperature in the 40s with some wind.
This could take weeks. A nice hobby for winter.
@copper said in Garden path:
Remember the formal garden?
I finally got around to having a mason put in a garden path in the middle of it.
The near end of this section was 8 inches too high.
So, I picked it up. The cobblestone is back on the pallet.
Next I'll pick up the base and make one end 8 inches lower. The base includes a layer of foam (pictured), sand layer, gravel layer and a stone restraint around the edge.
I found out last night that polymeric sand contains a binding agent that forms a solid joint. I thought it was just fine sand.
That made removal a chore.
Why not have the mason come back and fix it? I like a challenge. Temperature in the 40s with some wind.
This could take weeks. A nice hobby for winter.
Copper, I wish you'd asked about the polymeric sand. I'd have given you a heads up about it. It's great for brick mowing edges, but not so much for your project.
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login