Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • Users
  • Groups
Skins
  • Light
  • Brite
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse

The New Coffee Room

  1. TNCR
  2. General Discussion
  3. One of the largest modern US infrastructure projects will soon burrow toward New York City

One of the largest modern US infrastructure projects will soon burrow toward New York City

Scheduled Pinned Locked Moved General Discussion
1 Posts 1 Posters 9 Views
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • taiwan_girlT Offline
    taiwan_girlT Offline
    taiwan_girl
    wrote last edited by
    #1

    https://apnews.com/article/hudson-river-tunnel-new-jersey-nyc-2c102b1dc7bddebca21524a1dfbbfe17

    When the original train tunnel beneath the Hudson River connecting Manhattan to New Jersey was built more than a century ago, workers toiled with picks and shovels from each side until eventually meeting in the middle.

    A new tunnel, one of the largest U.S. mass transit projects in generations and which is expected to cost $16 billion, will take a decidedly modern approach.

    Giant drilling machines nearly the length of two football fields armed with cutters harder than diamonds will chew through dense rock. A crew of about 40 will oversee a conveyor system hauling out debris as well as equipment to install the tunnel's curved concrete lining.

    and

    The machines are expected to take about a year to grind through the first section in the New Jersey Palisades, which is made of tough volcanic rock, once digging starts later this year, according to Starace.
    That's about 30 feet of tunnel a day. Other machines will dig under the riverbed.

    In full, the new tunnel with two train tracks inside will run almost 2.5 miles (4 kilometers). The original two-tracked tunnel, damaged by saltwater during Superstorm Sandy, will be renovated.

    1 Reply Last reply

    Hello! It looks like you're interested in this conversation, but you don't have an account yet.

    Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

    With your input, this post could be even better 💗

    Register Login
    Reply
    • Reply as topic
    Log in to reply
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes


    • Login

    • Don't have an account? Register

    • Login or register to search.
    • First post
      Last post
    0
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Groups